758 B
758 B
PROJECT haga
TODO see TODOs in code
MAYBE Add factory floor optimizer
GA that optimizes factory floor
- data: graph of workstations with edge weights being the number of walks between them
- desired: optimal configuration that reduces crossings
- space: 15 workstations that can be positioned in a 20 x 20 space
Unsorted ideas
MAYBE Add seminar stats
-
Which topic was chosen how often, how are the priorities distributed etc.
fmap (\xs@(x : _) -> (fst x, fmap snd xs)) $ groupOn fst $ sortOn fst $ filter ((100 /=) . snd) $ mconcat $ snd <$> unP prios